trezor.io
Rate this file (Rating : 5 / 5 with 1 votes)
Construction of the World Trade Center
trezor.io

Construction Of The World Trade Center

The site of the World Trade Center was located on landfill with the bedrock located 65 feet (20 m) below. To construct the World Trade Center, it was necessary to build a "bathtub" with a slurry wall around the West Street side of the site, to keep water from the Hudson River out. The slurry method selected by Port Authority's chief engineer, John M. Kyle, Jr., involved digging a trench, and as excavation proceeded, filling the space with a "slurry" mixture composed of bentonite and water, which plugged holes and kept groundwater out. When the trench was dug out, a steel cage was inserted and concrete was poured in, forcing the "slurry" out. It took fourteen months for the slurry wall to be completed; it was necessary before excavation of material from the interior of the site could begin. The 1.2 million cubic yards (917,000 m3) of material excavated were used (along with other fill and dredge material) to expand the Manhattan shoreline across West Street to form Battery Park City.
In January 1967, the Port Authority awarded $74 million in contracts to various steel suppliers, and Karl Koch was hired to erect the steel. Tishman Realty & Construction was hired in February 1967 to oversee construction of the project. Construction work began on the North Tower in August 1968; construction on the South Tower was underway by January 1969. The original Hudson Tubes, carrying PATH trains into Hudson Terminal, remained in service as elevated tunnels during the construction process until 1971 when a new PATH station opened.
The topping out ceremony of 1 WTC (North Tower) took place on December 23, 1970, while 2 WTC's ceremony (South Tower) occurred later on July 19, 1971. The first tenants moved into the North Tower in December 1970; the South Tower accepted tenants in January 1972. When the World Trade Center twin towers were completed, the total costs to the Port Authority had reached $900 million. The ribbon cutting ceremony was on April 4, 1973.

File information
Filename:475374.jpg
Album name:World & Travel
Rating (1 votes):55555
Keywords:#construction #world #trade #center
Filesize:101 KiB
Date added:May 01, 2012
Dimensions:700 x 525 pixels
Displayed:54 times
URL:displayimage.php?pid=475374
Favorites:Add to Favorites