On February 25, 2009 a manual shutdown was initiated during the middle of a startup operation. The cause was a high pressure alarm that was caused by the shutting of a turbine bypass valve. The reactor was at 12% of full power when the alarm occurred at 4:03am due to a pressure increase to 1,029.8 psi, exceeding the regulatory limit of 1,002.2 psi. The reactor was reduced to 0% power, which exceeded the 5% threshold that requires event reporting, and pressure dropped back under the regulatory limit at 4:25am. Later, at 8:49am the control blades were completely inserted, constituting a manual reactor shutdown. An inspection then confirmed that one of the 8 bypass valves had closed and that the valve had a bad driving fluid connection. The reactor had been starting up following its 25 regular inspection which began on October 18, 2008.
On March 26, 2009 unit 3 had problems with over-insertion of control blades during outage. Repair work was being done on equipment that regulates the driving pressure for the control blades, and when a valve was opened at 2:23pm a control blade drift alarm went off. On later inspection it was found that several of the rods had been unintentionally inserted.

File information
Filename:371447.jpg
Album name:World & Travel
Rating (1 votes):55555
Keywords:#fukushima #dai #ichi #nuclear #power #plant #japan
Filesize:52 KiB
Date added:Apr 07, 2011
Dimensions:700 x 525 pixels
Displayed:18 times
URL:displayimage.php?pid=371447
Favorites:Add to Favorites