Three Gorges Dam Control Test, Yangtze River, Sandouping, China
|
The dam body was completed in 2006. Except for a ship lift, the originally planned components of the project were completed on October 30, 2008 when the 26th generator in the shore plant began commercial operation. Each generator has a capacity of 700 MW.
Six additional generators in the underground power plant are not expected to become fully operational until 2011. Coupling the dam's 32 main generators with 2 smaller generators (50 MW each) to power the plant itself, the total electric generating capacity of the dam will eventually reach 22.5 GW.
|
|